Les pelete predelovalni obrat proces
(Process to make more money)
• Les Material: Les dnevnik, lesni sekanci, les Trunk, itd
• Moisture: 45-50% depends on the weather situation.
• Step 1: Use wood chipper(disc type/drum type) to chip into 30-50mm
• Step 2: Primary Hammer Mill (change the chips to smaller size 10-20mm)
• Step 3: Three Pass Rotary Dryer (To dry the smaller size of Wood Chips to 18% moisture )
• Step 4: Secondary Hammer Mill (To make sure the saw dust size will be lower than 5mm)
• Step 5: Pelleting and Cooling Station: Process the saw dust into size 8mm diameter and 20-40mm adjustable length pellets.

Slame pelete Obdelava rastlin Postopek
( Economical Feasible process)
• surovine: koruzni slame, sončnično slama, sirek slama, neoluščen slama, itd
• Moisture: dried natually to 25% moisture roughly
• Step 1: Use grinder(tub grinder type) to grinde into 6--125mm
• 2. korak: Primarni Hammer Mill (spremenite velikost do manjše velikosti manj kot 10mm)
• 3. korak: za oblaganje in hladilna postaja: Process žaginega prah v premeru velikosti 8 mm in 20-40mm nastavljivo dolžino peletov.

EFB pelete predelovalni obrat proces
(proces inovativnosti)
• surovine: EFB
• Moisture: 50-55% depends on the previous process
• (whether EFB screw press is used)
• Step 1: Use chipper(drum type) to shorten the size into 30-50mm
• Step 2: Belt Dryer (To dry the EFB fiber to 18% moisture and oil content can be lowered down )
• Step 3: Secondary Hammer Mill (To make sure the saw dust size will be lower than 5mm)
• Step 4: Mixer (to mix the wood saw dust with EFB fiber to lower down S Content.
• Step 5: Pelleting and Cooling Station: Process the saw dust into size 8mm diameter and 20-40mm adjustable length pellets.